Thermo-Mechanic Thermo-MechanicShip and Boiler Repair Service
Service 04

Marine Incinerator Refractory and Firebrick Renewal

Removal of worn refractory from the combustion chamber, anchor inspection, firebrick placement, refractory application and curing.

Damage is first assessed in place. Cracked and spalled refractory is removed under control and the supporting surface and anchors beneath are inspected. Damaged anchors are renewed. Firebrick and insulating blocks are placed, with castable or gunning applied where required. Burner and gas passages are formed correctly and the curing process is completed.

RefractoryFirebrickAnchorsCombustion chamberDoor liningCuring
The combustion chamber after rebuilding
The combustion chamber after rebuilding
01

Scope

Sequence of work

  1. On-site assessment of the damage
  2. Controlled removal of old refractory, mortar and brick
  3. Inspection of the supporting surface and anchors
  4. Renewal of damaged anchors
  5. Placement of firebrick and insulating block
  6. Castable or gunning application
  7. Renewal of door refractory
  8. Forming of burner and gas passages
  9. Curing and controlled first firing

Where the work is done

  • On board, in the machinery space or on deck
  • In the yard, while the vessel is docked or alongside
  • In the workshop in Tuzla, when the equipment is removed and brought in
  • Across Türkiye and, where required, in foreign ports
02

From this work

The photographs were taken in the field and in the workshop. The captions describe only what is visible.

The combustion chamber after rebuilding
The combustion chamber after rebuilding
Before removal, damage visible on the refractory surface
Before removal, damage visible on the refractory surface
Worn and spalled area
Worn and spalled area
Brick placement in progress
Brick placement in progress
Renewed lining seen through the door opening
Renewed lining seen through the door opening
Cylindrical chamber with the application completed
Cylindrical chamber with the application completed
Burner passage after renewal
Burner passage after renewal
Incinerator unit with the doors open
Incinerator unit with the doors open
03

Other services

04

Contact

Request a survey

Scope and duration are not quoted before the failure has been seen in place. Let us know the port where the vessel lies and the type of equipment, and contact us using the details below to arrange a survey.

0542 325 04 37
Address
İstasyon Mah. Yarış Çıkmazı Sok. No:1
İSTİM Sanayi Sitesi, Tuzla, İstanbul
Clients
Ship agents, owners, ship operators, shipyards and industrial plants.
ESC